A 3 year phased renovation project of all their mechanical systems occupied in the high school building. The existing systems had to remain in operation as 3 new mechanical spaces were being added. We installed a hybrid geothermal system, incorporated plant heating, and a chilled and condenser water was designed allowing for maximum efficiency for all levels of load and occupancy.