Frederick Memorial Hospital Project 2000 – Phase 3

Frederick, MD

A renovation of an existing four story wing at Frederick Memorial Hospital. The hospital wing was in full operation 24/7 while the project was being completed. This project consisted of updating their existing HVAC and plumbing systems all while the medical gas systems remained in operation. The new HVAC equipment included a central station air handling unit and new piping systems included heating, chilled, steam and condensate piping and medical gas.

At a Glance

  • Sector:Medical
  • Client:Frederick Memorial Hospital
  • Size:384,000 Sqft
  • Contract Value:$7,050,038